Roofing, renovation, insulation
A roof you will not have to think about for thirty years.
Tiles, slate or zinc: we climb up, we photograph, we write down a precise quote. And we hand you the ten-year insurance certificate before the first tile comes off.

Handed over with every quote
- Ten-year insurance certificate
- Photos of your roof as we found it
- Materials named, with origin
What you can check before you sign
Ten-year insurance
The certificate comes with every quote.
RGE certified
The condition for insulation grants.
Safety before climbing
Scaffolding or guardrails in place before the first tile comes off.
Site left clean
Old tiles and offcuts taken away, gutters emptied.
Our trade
Everything that goes on a roof
Each service opens a page with what is included and a starting price.

Emergency tarping after a storm
Tiles blown off, a branch through the roof: we make it watertight the same day and document everything for your insurer.
from €290
Roof leak search and repair
A stain on the ceiling rarely sits under the leak. We find where the water really gets in, then repair only what needs repairing.
from €180
Tile roof renewal
Clay tiles, battens and underlay renewed, the rafters checked on the way: a roof done for the next fifty years.
from €120 per m²
Slate roofing
Natural slate, hooked or nailed, laid by hand: the roof of the region, for the life of the house.
from €160 per m²
Zinc work and gutters
Gutters, downpipes, flashings and ridge in zinc, shaped and soldered on site to fit your roof.
from €55 per metre
Moss removal and treatment
Moss removed by hand and a treatment applied, only when the roof needs it. We tell you when it does not.
from €18 per m²Recent jobs
Roofs we have done
A few recent jobs, with the material, the time it took and the town.

Roof renewed, dormer restored
A 1930s house re-tiled from ridge to gutter, with the dormer flashing redone in zinc.
- Interlocking clay tiles
- Rezé
- 12 days
- 2025

Natural slate, three dormers
A full slate roof hooked by hand, with the cheeks of three dormers rebuilt.
- Natural slate, hooked
- Orvault
- 4 weeks
- 2025

Standing-seam zinc roof
A low-pitched roof covered in zinc, the chimney flashing shaped and soldered on site.
- Natural zinc
- Nantes
- 9 days
- 2024

Three roof windows for a loft conversion
A dark loft turned into two bedrooms, three windows cut into the tiled slope.
- Roof windows and flashing kits
- Carquefou
- 3 days
- 2025

Rafters replaced before re-roofing
Rotten rafters found when stripping the roof, replaced before the new covering went on.
- Treated softwood
- Vertou
- 6 days
- 2024

Canal tiles re-laid on a stone house
Old canal tiles taken down, sorted and re-laid, the broken ones matched with reclaimed tiles.
- Reclaimed canal tiles
- Saint-Sébastien-sur-Loire
- 8 days
- 2024
From the first call to the handover
How a roofing job goes
We come and look
We climb onto the roof before pricing anything, and send you the photos of what we saw.
A written, detailed quote
Materials, area, scaffolding, waste removal: every line priced, the insurance certificate attached.
The work, on the agreed dates
The roof is made watertight every evening, even halfway through the job.
Handover and guarantee
We walk round the job with you and you sign the handover: the ten-year cover starts that day.
Good to know
Before you sign anything for your roof
Ten-year cover
For ten years after handover, it covers damage that undermines the roof or makes the building unfit for use. Ask for the certificate: a serious roofer hands it over without being asked twice.
Changing how the roof looks
A new material, a new colour or a new roof window means a prior declaration at the town hall. Processing usually takes a month, longer near listed buildings. We put the file together with you.
Insulation grants
Roof insulation can be funded by MaPrimeRénov' as part of a whole-home renovation, and by energy-saving premiums (CEE), provided an RGE-certified firm does the work. The rules change often: a France Rénov' adviser (0 808 800 700) will tell you what applies to you.
After a storm
Report the damage to your home insurer within the time your policy allows, usually five working days: storm cover is compulsory in every home policy. Take photos and have the roof tarped, the insurer expects you to limit the damage.
Natural disaster status
It only applies once an order is published in the Journal officiel; you then have 30 days to declare. Wind damage usually falls under the storm cover instead.
Door-to-door offers
We never knock on doors. If someone rings about "urgent" moss removal, remember that you have 14 days to cancel, and that no payment can be demanded within the first 7 days.
Where we work
Visits within the time shown after your call, in these towns.
Carquefou 44470
within 48 h
La Chapelle-sur-Erdre 44240
within 48 h
Nantes 44000
within 24 h
Orvault 44700
within 48 h
Rezé 44400
within 24 h
Saint-Herblain 44800
within 24 h
Saint-Sébastien-sur-Loire 44230
within 24 h
Vertou 44120
within 48 h
Once the scaffolding came down
What customers said
"The storm took half the ridge tiles on a Sunday night. The tarp was on by Monday noon, the photos went to the insurer the same day, and the repair was booked before the assessor had even called."
Sandrine L.
Storm tarping, Rezé
"Two companies wanted to redo the whole roof. He went up, replaced about thirty tiles and a length of flashing, and told me the rest would hold for another fifteen years."
Gérard M.
Leak repair, Orvault
"Our whole slate roof: scaffolding up on the Monday, tarped every evening, gutters redone in zinc, and a garden cleaner at the end than at the start."
Claire and Julien V.
Slate roof renewal, Carquefou
Free quote, no obligation
Tell us about your roof
The type of roof and a rough area help us prepare the visit. You do not know them? Leave them blank, we will see on site.
What happens next
- We call you within two working days to book a visit.
- We go up on the roof and take photos.
- You receive a written quote, the certificate attached.
